top of page
Peter - Airport
This was a job for the FBO center at the Reading Airport. As you can see in the first picture, the face of the cinderblock wall was pulling away from the secondary interior wall. To remedy this issue, we created a frame and anchored it through the two layers of cinderblock wall in an attempt to pull the exterior layer back in. It worked like a charm! After that, we installed a 28 gauge ABM panel in an owner selected color. A very cost effective and appealing solution.
bottom of page